
Past Performance

USS Zumwalt (DDG 1000)
Structural Support Installation AIT-0461 Low/Med Fidelity Simulator in Mississippi
​
Installation of structural foundations and support systems for simulator components in accordance with NAVSEA standards, ensuring stability, compliance, and operational integrity.
USS MICHAEL MONSOOR (DDG-1001)
Tool Issue and E Shop Space Mods
Fabricate and install new structural foundations and cableway supports for Disconnect Switches


USS LYNDON B. JOHNSON (DDG 1002)
Satellite Terminal Transportable Non-Geostationary (STTNG)
Installation
Installation of the STTNG antenna foundation and backup structure in accordance with NAVSEA standards. Installed and integrated the new STTNG antenna, power supply, rotary switch, circuit breaker, and stuffing tube, ensuring full compliance with approved specifications and operational requirements.
Stabbert Maritime-Ocean Titan
Generator salt water piping repairs
Performed generator sea water piping repairs during the Ocean Titan San Diego Port Call, fabricating and installing 316 stainless steel piping assemblies using existing templates, and welding components to specification

